Troubleshooting¶
Common Issues¶
Error message in Lime Marketing integration settings page¶
Description¶
You see a red error message on the Lime Marketing integration settings page.
Solution¶
Look in the webserver error logfile. If you have trouble with deciphering the error messages contact the Mtech team for support.
Problems with running tests for automatedflowparticipant¶
Description¶
You see get an error message on in the console when trying to run tests.
Solution¶
Test failure when building solution with addon-lime-automation in GitHub Actions¶
You get an error message with an OSError exception:
.venv\lib\site-packages\dynaconf\utils\files.py:13: OSError
Solution¶
Add this code for mocking the application config to the bottom of the fixture limeapp in conftest.py :
def _mocked_appconfig(*args, **kwargs):
return None
monkeypatch.setattr('lime_config.get_app_config', _mocked_appconfig)
Lime-admin crashes when I try to save my Automated flow decider mapping¶
Lime-admin throws an unintelligble error and freezes after trying to save. This is an issue in on-premise releases including and older than lime-crm = 2.308.7 and might happen if you try to save a flow decider item with an non-unique limetype and property combination.
Solution¶
Only create unique combinations of limetype and property, alternatively activate and close the browsers dev-tools which seems to alleviate the issue, this will only give you a proper error message though.
Can't save the config due to an error with "flow_decider"¶
If you are running version 4.0.0 of addon-lime-automation and have a solution based on the sales db template or have used the flow decider functionality previously you might have lingering config for flow_decider causing the config to not be saved.
Solution¶
Remove the flow_decider config via the "code" view in lime-admin.
Unexpected participants or cancellations in an automated flow¶
Description¶
An automated flow in Lime Marketing has participants with the source Lime CRM that do not exist in Lime CRM, or participants get the status Cancelled without anyone cancelling them.
Solution¶
Check whether a copy of production, such as a test environment, still has the automated flows of production and points at the same Lime Marketing app. If it does, remove apiurl and apikey from its application config right away, then delete its automated flows. See Copies of a Lime CRM environment.
Participants the copy already added get the rest of the flow until you remove them from the participant list of the flow in Lime Marketing. Participants it cancelled in production stay cancelled.